Egypt & Uzbekistan
Sea + rail

Sea+road · Alexandria → Poti → Aktau

Sea+road · Alexandria → Poti → Aktau — Sea + rail freight from Egypt to Uzbekistan, transit 25–40 days

Transit band

25–40 days

Cost band

$Low cost

Mode

Sea + rail

A second multimodal alternative to the Northern Route and the Middle Corridor: sea from Egypt to Poti port in Georgia, then across the Caucasus by road or rail to a Caspian port, ferry to Aktau or Kuryk, then Kazakh rail to Tashkent.

The route in one sentence

Alexandria (EGALY) → Poti (GEPTI) by reefer feeder ship, then road or rail via Tbilisi → Baku → Caspian ferry to Aktau or Kuryk → Kazakh rail → Tashkent.

The legs

LegModeTransit
Alexandria → PotiReefer feeder ship5–8 days
Poti → BakuRoad or Georgian rail2–4 days
Baku → Aktau / KurykCaspian ferry18–24 h at sea + variable wait
Aktau / Kuryk → TashkentKazakh rail6–9 days

Total door-to-door

Alexandria → Tashkent: 25–40 days.

The wide range reflects two unpredictable variables: sea-feeder frequency into Poti, and Caspian ferry waiting times in Baku.

What it suits

  • Ambient and shelf-tolerant product — dates, garlic, onions, potatoes, late-season pomegranate
  • Buyers comparing this route with the Middle Corridor (TITR) for cargo-flow flexibility

What it doesn't suit

  • Time-critical reefer programmes
  • Soft fruit, fresh strawberry, mango — use air freight

Common questions

  • How does this route compare to the Middle Corridor (TITR)? Both rely on a Caspian ferry leg with similar wait dynamics. TITR via Mersin and the BTK railway is generally the better choice for ambient FCL out of Mersin; the Poti route is the Black Sea alternative when sea capacity at Mersin is tight. See the Middle Corridor (TITR).

  • Is reefer maintained throughout? Sea + rail legs are reefer-capable; the Caspian ferry leg has limited reefer-plug capacity, so reefer slots are booked in advance and pack-out is timed to a known sailing window.

  • What documentation is required? Phytosanitary certificate from Egyptian CAPQ, Certificate of Origin, ACID number via Nafeza, Bill of Lading, plus transit documents for Georgia, Azerbaijan and Kazakhstan.

For a CIF Tashkent quote on this route, send an RFQ — indicative pricing within 48 working hours.

Sea+road · Alexandria → Poti → Aktau — frequently asked

How long does the Alexandria → Poti → Aktau route take?
25–40 days. Slowest of the mainstream routes but lowest cost-per-kg for non-time-sensitive commodities like onions, potatoes, and Valencia oranges.

Request a quote

Send a request — our export desk replies with an indicative quote.